愛知県zaki City, Aichi Prefecture: Subsidy for installation of地球zaki Global Warming Counter s (for business operators)

Agency岡崎市
Max amount
¥2,000,000
Rate
50%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-12-28 (205d)
Area
愛知県
Single area

Summary

This is a system targeted for business menus among subsidies for installation of global warming counter s in和zaki City. As a facility for business use by business operators with offices and offices mainly in the city, part of the target expenses is provided when installing solar power equipment, lithium-ion storage system for business, high-efficiency air conditioning equipment and high-efficiency lighting equipment. In the PPA model utilization model, decarbonization-related businesses that install solar power equipment or electricity storage systems using PPA models are also eligible for the city operator. The target person is a decarbonization-related company that purchases the target equipment as a city operator, and installs it for business by themselves, or by PPA model. It is necessary not to pay the city tax, do not fall under the gangster etc., do not be a national or public corporation, special sales related to sex and morals, political organizations, religious organizations, etc., and if you do not own the place of installation, you need to obtain consent from the owner for the installation and restriction period. Equipment that utilizes the acceleration business of priority measures must be requested by decarbonization related companies. The auxiliary expenses are excluded from the consumption tax and local consumption tax, at the cost necessary for the introduction of the target equipment, among the expenses specified in the国 Table 1. It is necessary to install a power generation measuring instrument, self-consumption of more than 50%, and not acquire FIT/FIP certification. The electricity storage system needs to be installed simultaneously as an auxiliary equipment for photovoltaic power generation equipment, and there is a limitation of the cost per capacities. High-efficiency air-conditioning and lighting are subject to change of existing equipment. Air-conditioning is 30% or more, and lighting needs to meet the requirements of LED lighting fixtures

Tags

Capital investmentEnergy saving / decarbonization