Tomatsushima City Decarbonization Pre-region Development Project Subsidy
Summary
1Business overview: Tomatsushima city decarbonization pre-region development project subsidy is a system that supports the introduction of equipment to make local production model of renewable energy in the decarbonization pre-region area selected by the Ministry of the Environment. In the City Guidelines, expenses related to the introduction of renewable energy and the introduction of energy-saving equipment are included in the budget. On the official page of the 2019年度 year, solar power generation facilities, solar car ports, storage batteries,事業者 car shares for business operators, V2H etc. are guided as a center menu. 2 Subjects: Subjects are citizens or business operators, citizens refer to corporations that own business activities in the city, etc. In the令 year of Reiwa, it is assumed to have a residence, office, etc. in the Nohru district, which is the predecessor of decarbonization, or to be a residence. It is required that there is no person who receives the same equipment in the same household as a common requirement, there is no市 gnation such as city tax, and it is not a gangster or gangster. The equipment is limited to commercialized and introduced, and used equipment is not applicable. 3Auxiliary expenses and subsidy contents: Auxiliary target is a facility that is necessary for solar power equipment, storage battery, charge-discharge system, charging system, external power supply system,V car share, and other decarbonization business. Construction costs, equipment costs, work expenses, office expenses, vehicle costs, etc. are defined, including material costs, labor costs, machine costs, design and surveys, equipment purchase, installation, consignment fees, lease fees, etc. It is important that solar cells do not acquire FIT/FIP certification, do not send self-delivery, meet the requirements of self-consumption and local consumption, and the battery is assumed to store electricity for re-energized power plant. 4Points of subsidy, upper limit, schedule,