Support subsidy for introduction of solar power plant in Noboribetsu City

Agency登別市観光経済部商工労政グループ
Full official PDF
Max amount
¥10,000,000
Rate
50%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2027-02-10 (249d)
Area
北海道
Single area

Summary

In order for Noboribetsu city to decarbonize the city, the subsidy is a system to support the introduction of self-consumption solar power equipment by business operators, fixed storage batteries for business and household use, in-vehicle battery, charge and discharge equipment etc. Utilize the regional decarbonization and re-energization grants of the Ministry of the Environment to boost the introduction of equipment that consumes electricity generated at business sites. 2In addition to business operators with offices in the city, the target is a PPA business operator that supplies electricity to the company with lease model and on-site PPA model. The Company, Association, Medical Corporation, Social Welfare Corporation, School Corporation, Public Interest Foundation, Cooperative Association, etc. It is required that there is no unpaid city tax, no gang party, public business, political activities, religious activities, etc. 3Auxiliary target is a business that introduces un。 solar power equipment to the office, a storage battery that introduces as an incidental equipment for solar power equipment, in-vehicle battery, charge and discharge equipment, etc. It is necessary to consume 50% or more of the power generation power generation electricity at home without obtaining FIT/FIP certification. It is not possible to apply for battery alone, car type battery alone, charge and discharge system alone. The 4 auxiliary amount is up to 10 million yen per kW of solar power equipment, up to 6 million yen per cent of battery price, and up to 2 million yen per cent of vehicle storage capacity. The application period is from May 1, 2026 to February 10, 2027. In principle, the contract and order after the grant decision is made, and the results report is made within 30 days after completion or by the early March 10, 2027.

Tags

ManufacturingConstructionWholesaleRetailFood serviceTourism / lodgingTransport / logisticsHealthcareNursing / welfareEducationAgriculture / fisheryService (other)OtherEnergy saving / decarbonizationCapital investmentRegional revitalization