Subsidy for the introduction of solar power and storage system for business operators

Agency新潟市役所 環境政策課 ゼロカーボンシティ推進室
Full official PDF
Max amount
¥5,000,000
Rate
33%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-12-25 (202d)
Area
新潟県
Single area

Summary

1Business overview: Niigata City is a subsidy to support the introduction of self-consumption solar power systems and storage systems for small and medium-sized companies in the city affected by the rise of energy prices. In addition to the introduction of self-owning, PPA and leasing are also included in the purpose of counter。s against rising prices and decarbonization management. A new facility is introduced in the city office, and it is assumed to be contracted and started after the grant decision. 2 Subjects: Small and medium-sized enterprises who have head office, branch office, office, etc. in the city and are employing employees at the time of application. In addition to small and medium enterprises, we also include social welfare corporations, school corporations, general corporations, public corporations, and non-profit organizations. In the case of PPA leasing, the installation operator must meet these requirements, not the equipment owner. There are conditions such as city tax payment, past unreception, duplication with national assistance. 3Auxiliary expenses and auxiliary contents: Solar panels, power conditioners, mounting bases, construction costs, fences in case of over 20 kW. Battery facilities include battery power conditioner, mounting base, mounting platform, and construction cost. It is not applicable to removal and relocation, water-proof construction, soil construction, construction frame construction, system connection burden, waste disposal cost, consumption tax. 4Points for subsidy, upper limit, schedule, and application: The application period will be accepted on a first-come-first-served basis from May 1st to December 25th, 2019. Solar power is 50,000 yen, power output kW, and up to 5 million yen. The battery is less than 1/3 of the auxiliary expenses, with a maximum of 160,000 yen/kWh, 1/3, and less than 1000 yen. The results will be submitted within 30 days after the completion of the report or by the early March 1, 2019.

Tags

ManufacturingConstructionWholesaleRetailFood serviceTourism / lodgingTransport / logisticsProfessional servicesHealthcareNursing / welfareEducationService (other)OtherCapital investmentEnergy saving / decarbonizationRegional revitalization