Subsidy for the introduction of self-consumption type renewable energy in FY2019

Agency神奈川県
Full official PDF
Max amount
¥35,000,000
Deadline
2027-02-26 (265d)
Area
神奈川県
Single area

Summary

1Business overview: This subsidy is a system to support businesses that introduce self-consumption renewable energy power generation facilities to local facilities in order to decarbonize industrial and business sectors. The target power generation facility is solar, wind, hydro, geothermal, and biomass, with solar power of 10 kW or higher, wind power of 1 kW or higher, water power of 1,000 kW or less, and biomass has equipment requirements such as 60% or higher dependency. The power generated is not sold by FIT/FIP certification, but it is assumed that it is consumed for business in the prefecture. 2 Subjects: Individual business operators who conduct auxiliary business and own equipment (。ing national and public corporations) or conduct blue declarations are eligible. In case of leasing, installment, PPA model, and solar loan, leasing and other business operators are required to cooperate with equipment users. In addition, it is necessary not to apply duplicates in the same place and the same subsidy business in the same year, not applicable to banking, bankruptcy, rehabilitation, excess debt,県gnation of pre、ural tax, no、 of the prefecture, gangster relationship etc. 3Auxiliary Exp。s and Subsidies: Subsidies are not included in the consumption tax and local consumption tax in the facility and installation work expenses (including design costs) necessary to carry out the subsidy business. It is necessary to install a reenergized power plant, but it is necessary to install it together with the power plant installed in this auxiliary business, and it is a stationary equipment that can store power at such facility priority. All facilities are non-。 and are important requirements such as not to relocate their own home consumption rate of 50% or more, pre。ural installation, consumption, and environmental value outside the prefecture. 4 Points of subsidy, maximum, schedule, and application: Re-energy power generation facility is 80,000 yen per 1kW, and 20,000 yen per 1kW

Tags

ManufacturingConstructionWholesaleRetailFood serviceTourism / lodgingTransport / logisticsProfessional servicesHealthcareNursing / welfareEducationService (other)OtherEnergy saving / decarbonizationCapital investment