Subsidy for the foundation construction business for the utilization of nursing-related data (insurance medical institution) (FY2019)
Summary
This subsidy is a support for health insurance institutions among the “base building projects for the utilization of nursing-related data” conducted by the National Health Insurance Central Association of Japan. The aim is to utilize nursing-related data among municipalities, nursing care facilities, and medical institutions to improve operational efficiency and quality of care and medical services. The target central work is an environmental development that enables electronic transmission through a line and nursing information infrastructure that connects the doctor's opinion to an onlineシステムdential verification system. In order to use the nursing information infrastructure, the subject is an insurance medical institution. Grants are expenses such as setting up a line connected to an onlineシステムdential verification system, and system repairs, including electronic medical records, document creation software, etc., which are necessary for electronic transmission via nursing information infrastructure. It is not a general-purpose terminal purchase such as a PC, but it is the axis of the refurbishment and setting to refuse electronic transmission of the main doctor opinion book. Auxiliary rate and upper limit are divided by the number of beds. Hospitals of more than 200 beds are treated with tax. The grant amount compares the amount and upper limit of the auxiliary rate multi by the amount deducted from the target expenses and other income, and decides the lesser than 1,000 yen. Application is only one time per insurance medical institution number. The application period is from May 7, 2019 to March 12, 2019. After the application is completed, input the necessary information from the nursing information base portal, attach receipts, booklets, documents that can confirm the number of beds, etc. with electronic files. It is important to complete the application on the portal after the renovation is completed, as the reception period may be shortened or canceled due to t