Subsidy for Special High-Pressure Electric Charges for Small and Medium Enterprises in Fukushima Prefecture

Agency福島県商工労働部経営金融課
Full official PDF
Max amount
¥30,000,000
Deadline
2026-06-12 (6d)
Area
福島県
Single area

Summary

1Business overview: The subsidy for high-voltage electric charge support for small and medium enterprises in Fukushima Prefecture (the 7th solicitation) is a system that aims to reduce the burden of small and medium enterprises in the prefecture due to the rise of electricity charges. For tenants who have entered into a special high-voltage power contract, or who are moving in to a special high-voltage power receiving facility such as a commercial facility or a factory, the special high-voltage power electric charge used from January to March, 2019 will be issued. 2 Subjects: The target is small and medium-sized enterprises that have offices in Fukushima Prefecture and move into small and medium-sized enterprises that use electricity based on special high-voltage power contracts, or prefecture factories and distributors that have contracted special high-voltage power supply and demand. Small and Medium Enterprises are excluded. It is not applicable to those who have received other subsidies for reducing the burden of electricity usage by politic organizations, religious organizations, countries or prefectures, such as national or local public organizations, public corporations, and customs sales. 3Subsidy Exp。s and Subsidies: Subsidy Exp。s are used in福島県 with special high-pressure receiving contracts in offices in Fukushima Prefecture, etc., and are charged for electricity use. From January 1, 2019 to February 28, 2019, and from March 1, 2019 to March 31, 2019, the period for January and February is calculated by multiplying 2.3 yen per 1kWh, and 0.8 yen per 1kWh for March use. In the event that an administrator of the facility or the like submits an application for the tenant, the equivalent amount of the support fee must be properly distributed according to the power usage of each tenant, and the tenant may not be able to apply directly. 4 Points of subsidy, upper limit, schedule, and application: This is a unit price system that multiplys the subsidy for the powe

Tags

ManufacturingConstructionTransport / logisticsWholesaleRetailFood serviceTourism / lodgingProfessional servicesPersonal servicesEnergy / utilityService (other)OtherRegional revitalizationEmployment / training