Subsidy for securing and fixing of employees in Sumida-ku

Agency墨田区産業観光部経営支援課
Full official PDF
Max amount
¥400,000
Rate
67%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-12-21 (198d)
Area
東京都
Single area

Summary

1Business overview: This subsidy is a system to support businesses working to prevent heat。ke, which may work in a hot environment after establishing work rules in order to secure and maintain employees in Sumida-ku. Assuming the preparation, review, and confirmation of 業 regulations and the implementation of work environment as a series of business, it is assumed to work in outdoor construction, civil engineering, security, home delivery, warehouse handling without air conditioning, and factory work using heating machines. 2Applicants: The applicant is a small and medium-sized enterprise under the Small and Medium Enterprise Law and has a main business in Sumida Ward for more than a year, and is a business that does not pay corporate capital or special ward tax. It is necessary to maintain a working environment through prevention of heat ke at the office of the ward office, etc., that there is more than one employee who always employs at the time of the application date, and to not be a gangster or moral business. In with the Occupational Health and Safety Regulations, a system to prevent heat ke, procedures, and measures to stakeholders are required. 3Auxiliary Exp。s and Subsidy Contents: Subject Exp。s are consignment fees to social insurance labor consultants, construction costs as heat stroke counter。s, equipment purchase costs and consumables purchase costs. Examples include roof insulation coating, spot , large 送風機, work clothes with fan, heat insulation helmet, WBGT meter. On the other hand, general-purpose products such as general-purpose office equipment, cold towel, air conditioner, used goods, consumables exceeding the number of employees are not eligible. Contracts, orders, and payments before the grant decision are excluded. 4 Points of subsidy, upper limit, schedule, and application: The subsidy upper limit is 4 million yen, and the 業 rules are maintenance 1/2 of the subsidy target cost, 100,000 yen, and 2/3 of the subsidy prevention measures are 。nc。,

Tags

ConstructionTransport / logisticsManufacturingWholesaleRetailService (other)OtherEmployment / trainingCapital investment