Special high-voltage electric charge 緩和endous mitigation business subsidy (from January to March 2019)

Agency宮崎県商工観光労働部 企業振興課 食品・工業・情報産業担当
Full official PDF
Max amount
¥137,155,000
Deadline
2026-06-12 (6d)
Area
宮崎県
Single area

Summary

In order to reduce the burden of small and medium-sized enterprises affected by special high-voltage electric bills, the special high-voltage electric bills in Miyazaki Prefecture are subsidized according to the special high-voltage electric usage from January to March. As of April 28, 2019, the recr ing procedure is organized to support small and medium-sized enterprises and small enterprises under the Small and Medium Enterprise Basic Law. Applicants are tenants of small and medium-sized enterprises who directly receive special high-voltage power at the pre ural facility, and they can confirm the status of tenants in the contract etc., and are small and medium-sized enterprises who are responsible for the electricity fee. However, the target operators of the emergency support business in the medical and welfare sector are excluded. There is no pre ural tax, the corporation carries out special collection or pledge to start the tax, and it is also a requirement that there is no relationship with the gangster etc. The subsidy cost is a special high voltage electric usage used by the subject, and the subsidy amount is calculated at a single price per meter per month. In January and February of 2019, the inspection needle for January and February is less than 1.2 yen per 1 kWh, and the inspection needle for March of 2019 is less than 0.4 yen per 1 kWh. In the power usage confirmation, the total amount of January and February is "Power consumption × 1.2 yen / kWh" and the amount of grant application is calculated by de。ing less than 100 yen. The application period is from May 19 to June 12, 2019. The budget is 137,155 thousand yen. If the total amount of the application exceeds the budget, the budget is divided. Amount max is 137,155,000 yen for display. Applicants must submit an application form, power usage confirmation, pre ural tax payment certificate, special collection confirmation, start pledge, pledge, etc.

Tags

ManufacturingWholesaleRetailService (other)IT / softwareEnergy / utilityOtherEnergy saving / decarbonizationRegional revitalization