Reiwa 8(2026)Recr ment of a subsidy project for improving productivity in manufacturing industry

Agency栃木県産業労働観光部工業振興課ものづくり企業支援室
Full official PDF
Max amount
¥10,000,000
Rate
50%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-06-15 (9d)
Area
栃木県
Single area

Summary

One subsidy is a system that supports the introduction of production equipment corresponding to the U.S. customs requirements and the Middle East situation in order to improve productivity and competitiveness of manufacturing companies in the prefecture. The target business plan contributes to the introduction of efficient production methods, the advancement of production technology, and the efficiency of supply of raw materials required for production. The application plan is adopted by the document review and business evaluation committee. 2The target is small and medium-sized enterprises who are manufacturing in。. However, large enterprises are excluded, and application companies are limited to industrial-class manufacturing. 1Advance consultation with the Industrial Promotion Division is necessary for applying for one company. Businesses who have published the Partnership Building Declaration will be eligible for screening of the Business Plan as of the day before the application deadline. 3Auxiliary expenses include external investigation, analysis and guidance expenses, design expenses such as machine equipment production and installation, production line redesign, purchase of machine equipment and tool equipment, prototype, improvement, installation, borrowing, repair, incidental minor electrical work, layout change, system introduction cost to efficiently operate installation equipment, product measurement, analysis, testing, and program development. General-purpose software equipment such as consumption tax, building construction costs, versatility vehicles and Offices are not eligible. 4The auxiliary limit is less than 10 million yen, the auxiliary rate is less than one-half of small and medium enterprises. The recruitment period is required from April 15, 2019 to June 15, 2019, and the adoption is mid-July, the application and grant decision is early August, the end of the business and the result report is until the end of February, 2019, and the payment

Tags

ManufacturingCapital investmentRegional revitalization