[Osaka City] Subsidy and subsidy: "Support Project Subsidy for Energy Saving and Saving CO2 Acceleration Support Project for Small and Medium Enterprises in Reiwa 8"

Agency大阪市
Official web page
Max amount
¥30,000
Rate
100%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2027-03-31 (298d)
Area
大阪府
Single area

Summary

1Business overview: The energy-saving and CO2事業elerating support project subsidy for small and medium-sized enterprises in FY2019 is a support system conducted by Osaka City to boost new initiatives and necessary expenses according to the business purpose indicated in the materials. The application form explains the purpose of the system, the subsidy program, the examination and submission method at the time of application, and the applicant must create a plan while confirming the official guidelines and style. 2 Subjects: “4. Adoption of auxiliary operators .....................................................................................................................................................................................................-6 – The auxiliary operators (executive organizations) related to “Energy-saving and CO2 Acceleration Support Project Cost Aid” and “Early energy-saving of small and medium-sized enterprises” and “In。 renewable energy” There may be requirements such as location, business category, tax gnation, past adoption and other subsidy, and gangster elimination. It is important to check whether the company is applicable to the target area, the target industry, the corporate rating, etc., and prepare necessary pledges and certificates. 3Auxiliary expenses and auxiliary contents: The auxiliary target is to assist those who renovate to the insulation window in existing housing, etc., to reduce the cost burden, to receive a diagnosis, etc. Please write clearly that it is necessary to carry out the accompanying business, and the business cost is the cost of supporting the auxiliary business, etc. However, the cost of work and work expenses are the expenses that変動ctuate to the cost according to the application status of the auxiliary company, and the number of auxiliary proposals, such as the amount of auxiliary expenses, and the category of auxiliary expenses. It is often necessary to have basic materials such as estimates, receipts,

Tags

IT / softwareEnergy / utilityEnergy saving / decarbonizationIT / DXCapital investment