Kitakata City, Fukushima Prefecture: Energy-Efficient Equipment Upgrade Support Subsidy for Businesses (2nd-Time Users) ≪Phase 2≫
Summary
Kitakata City’s energy-saving equipment renewal support subsidy (for the second and second use of this subsidy) is a system that supports businesses in Kitakata City who face the rise of crude oil, raw materials and energy prices to renew to energy-saving facilities. The above page explains that we will assist in updating to facilities with high energy saving effect by business operators, etc., and the second category that uses the same subsidy in FY2019 can be applied from May 1, 2019 to November 30, 2019. Targets are local business operators, including corporations, corporations, NPOs, general corporations, social welfare corporations, medical corporations, school corporations, cooperative associations, and individuals who continue to operate. Even if there is a head office outside the city, it is eligible for facility renewal at business sites in the city. On the other hand, those who are involved in gangsters, those who have a city tax delin t, and those who receive the subsidy of national and other organizations for the same supplementary expenses are not eligible. Auxiliary expenses are the equipment purchase expenses for updating from existing equipment to energy-saving equipment, installation work, etc., and the removal cost of existing equipment. High-efficiency lighting (LED, etc.), air conditioning, electric refrigerator, electric freezer, machine equipment, etc. are shown as an example. As a general rule, it is important to order to local business operators, as a general rule, that the utility cost and fuel cost of three consecutive months after November 2020 exceed the same period from November 2019 to October 2020. Auxiliary rate is less than two- rds of auxiliary expenses, the upper limit of the auxiliary is 1 million yen, and the lower limit of the auxiliary is 50,000 yen. If the subsidy target cost is less than 70,000 yen, it is not included in the subsidy target cost. After the grant decision is made, the delivery, inspection, payment, and report m