FY2026 Niigata Prefecture Subsidy for Installing Continuous Monitoring Systems for Commercial Refrigeration Equipment
Summary
1Business overview: This is a subsidy for small and medium enterprises who have introduced a fluorocarbon leak monitoring system for commercial refrigeration equipment. A system that monitors leakage and failure at all times by IoT technology, and aims to reduce the burden of operators affected by fluorocarbons, early detection, and rising electricity bills at the same time. 2 Subjects: The target is a person who owns or uses the office in the prefecture, in small and medium-sized enterprises, small and medium-sized enterprises, cooperative associations of small and medium-sized enterprises, and individual business owners. In addition, it is necessary to be the owner or manager of commercial refrigeration refrigeration equipment, there is no県gnation of pre ural tax, and it does not fall under antisocial forces. In addition to the Declaration of Partnership Building, it is necessary to participate or apply for participation in the エコ Eco Business Awards system. 3Auxiliary Exp。s and Subsidy Contents: The cost of purchase of the IoT device body and standard accessories required for continuous monitoring system, and the construction cost of installing the IoT device to a commercial refrigeration refrigeration device. Construction costs include material costs, labor costs, direct expenses, common provisional expenses, site management costs, and general management costs. Consumption tax, local consumption tax, communication fee, and system usage fee are not included. 4Points of subsidy, upper limit, schedule, and application: The subsidy rate is less than 2/3 of the subsidy expenses, and the subsidy upper limit is 2 million yen per business. Since the total amount of operations performed at multiple sites varies depending on the number of sites and the target expenses, the display cap is treated as the maximum unit of the business. The application period is from April 24, 2026 to January 29, 2027. However, it will be closed even during the period when the budget is reache