Skip to content
助
助金 / JokinPublic subsidy guidance
HomeAll subsidiesFinancingLife
HomeAll subsidiesFinancingLife
助助金 / Jokin

Public subsidy matching and application support

Navigation

  • Browse all subsidies
  • Life and community subsidies

About

This service provides reference information; final eligibility and amounts are determined by each implementing agency.

Policies

  • Privacy Policy
  • Terms of Use
  • Operator info

Data sources

  • J-Grants
  • J-Net21
  • Subsidy Portal

Language

© 2026 助金 / Jokin

FY2026 Fukushima Prefecture Residential Solar PV / Battery / V2H Support Subsidy

Agency福島県(運営:福島県再生可能エネルギー推進センター)
Full official PDF
Max amount
¥200,000
Deadline
2027-03-12 (273d)
Area
福島県
Single area

Summary

1) Project overview: Fukushima Prefecture provides this subsidy, within budget, for installing residential solar PV systems, storage batteries, and V2H (vehicle-to-home) equipment within the prefecture. The scheme operates under the 'FY2026 Fukushima Residential Solar PV Equipment Introduction Support Subsidy Implementation Guideline'. Two cases are funded: (1) installation of new residential solar PV (to promote in-prefecture deployment of renewable energy), and (2) addition of a storage battery or V2H system to an existing solar PV setup that is NOT under a Feed-In-Tariff (FIT) electricity contract (including FIT contracts whose period has expired), to promote effective use of renewable energy. 2) Target applicants: Eligible recipients are individuals (including sole proprietors), corporations, or building-management persons (defined under Article 25(1) of the condominium law) who install the eligible system AND satisfy ALL of the following: (i) installed an eligible system at a residence in the prefecture, or purchased a residence with eligible system installed from a builder/seller in the prefecture (excluding zero-initial-cost models and lease installations); (ii) have no overdue prefectural taxes; (iii) are not gang members or affiliated business operators. Corporations/sole proprietors are eligible provided the building's registry is 'residential', and the PV module/PCS rated output is under 10 kW. 3) Eligible expenses / subsidy content: Three system types: (a) Solar PV — under 10 kW, unused panels/PCS, connection contract concluded between 1 April 2025 and 12 March 2027, no prior receipt of this subsidy for solar PV; (b) Battery storage — registered under the national SII subsidy framework, attached to an under-10-kW PV system without active FIT contract; (c) V2H — registered with the Next Generation Vehicle Promotion Center, attached to under-10-kW PV system without active FIT contract. Eligible expenses cover modules, mounts, PCS (inverter/protection), peripherals (junction box, switches), installation work (wiring, electrical, safety), batteries, V2H equipment, and respective installation work. 4) Subsidy rate / cap / schedule / application points: Solar PV: 40,000 yen × kW (truncated below 2 decimals), cap 160,000 yen. Battery: 40,000 yen × kWh, cap 200,000 yen. V2H: fixed-amount, cap 100,000 yen. Application window: 20 May 2026 — 12 March 2027, first-come first-served until budget exhausted. Submission requires Form 1 (application form) plus: applicant's resident certificate (for corporations, certificate of company registration), Fukushima prefectural tax non-arrears certificate, copy of bankbook for subsidy transfer, Fukushima J-Credit Club entry form (or non-entry reason letter), plus system-specific attachments (utility contract docs, purchase/work contract, receipts, output comparison tables, color photos of installation, building registry, owner consent letter if not own building). Only one of battery or V2H is permitted per applicant.

Tags

Energy / utilityReal estate / leasingPersonal servicesOtherEnergy saving / decarbonizationCapital investmentRegional revitalization