FY2019 Subsidy for the introduction of solar power plant for Nono City business operators

Agency野々市市 地域政策部 市民生活課
Max amount
¥10,000,000
Rate
33%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-11-30 (177d)
Area
石川県
Single area

Summary

This subsidy program by Nonomichi City promotes the installation of solar power generation equipment and related devices by business operators in the municipality, aiming to increase local energy self-sufficiency and advance decarbonization. Targeted at corporations and individual business proprietors operating within Nonomichi City. Coverage includes installation costs for solar power systems, battery storage, power conditioners, and similar equipment (specific cap amounts and subsidy rates require verification in the detailed guidelines). Applicants must refer to the city's official requirements for eligible equipment, certification standards, and application procedures for fiscal year 2026. Early information gathering and application preparation are critical, as the fiscal year 2026 budget may impose limitations on application deadlines and available subsidy amounts.

Tags

Capital investmentEnergy saving / decarbonization