Energy Saving Subsidy

Agency新潟市経済部企業誘致課
Full official PDF
Max amount
¥10,000,000
Rate
30%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2027-02-28 (267d)
Area
新潟県
Single area

Summary

1Business overview: Niigata City’s subsidy for labor saving and energy saving is a system to support small and medium-sized companies with factories or logistics facilities in the city to introduce production equipment and digital technology to reduce production cost and labor shortage. It is the purpose of strengthening the competitiveness of the city industry by obtaining new equipment to the factories and logistics facilities in the city and supporting businesses that lead to labor saving and energy saving. 2 Subjects: Small and medium-sized companies with factories and logistics facilities in the city, centered on manufacturing, newspaper, publishing, road freight forwarding, warehouse, commodities and port transport logistics facilities. It is explained that it is not covered on official page of construction, wholesale, and retail business. It is necessary not to pay city tax, not to be a national or local public entity, and there is no violation of laws and regulations. 3Auxiliary expenses and auxiliary contents: The target expenses are set up in the city and logistics facilities, and the consumption tax amount is excluded in the installation expenses such as equipment that is directly provided for business. The rental of the machine and equipment is excluded, while the software charges are included. The lower limit of the acquisition price is 1 million yen, and the grant requirement is determined to determine the decarbonization requirements such as work efficiency, reduction of CO2 emissions, energy saving effect, and conversion from fossil fuel to power. 4Points of auxiliary rate, upper limit, schedule, and application: Class A is 10%, upper limit 2 million yen, category B is 20%, upper limit 5 million yen, category C is 30%, upper limit 10 million yen, and subsidy rate is 0.3. The application period of the official page is limited from April 1, 2026 to the end of February 2027. Preliminary consultation is required for the application, and the order of equi

Tags

ManufacturingMedia / ads / printTransport / logisticsCapital investmentEnergy saving / decarbonizationIT / DX