Skip to content
助
助金 / JokinPublic subsidy guidance
HomeAll subsidiesLife
HomeAll subsidiesLife
助助金 / Jokin

Public subsidy matching and application support

Navigation

  • Browse all subsidies
  • Life and community subsidies

About

This service provides reference information; final eligibility and amounts are determined by each implementing agency.

Policies

  • Privacy Policy
  • Terms of Use
  • Operator info

Data sources

  • J-Grants
  • J-Net21
  • Subsidy Portal

Language

© 2026 助金 / Jokin

Auxiliary fund for accelerated business of Higashimatsushima City, Reiwa 8

Agency東松島市 SDGs・脱炭素社会推進課 SDGs・脱炭素社会推進係
Full official PDF
Max amount
¥100,000,000
Rate
67%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-12-15 (192d)
Area
宮城県
Single area

Summary

1Business Outline: Tomatsushima City is a subsidy for the accelerated business of the 8th year of Reiwa to support the introduction of energy-saving equipment and reenergizing facilities for citizens and local businesses to achieve zero carbon. For solar power generation, solar carport, storage battery, EMS,V/PHEV, charge/discharge facilities, high-efficiency air conditioning, high-efficiency water heaters, etc. 2Applicants: From April 1, 2019 to February 26, 2019, the facility will be set up from contract to installation, and citizens or local businesses who can submit the actual report are eligible. Citizens are expected to be a contractor with a corporation or city who owns business activities such as city offices, etc. It is necessary not to receive a subsidy of the same equipment in the same household, there is no市 gnation such as city tax, no gangster etc., continuous use of the service life equivalent period, and the burden and assistance of the country by the other system. 3Auxiliary expenses and auxiliary contents: Solar power facilities are based on 70,000 yen/kW (up to 10 kW), 50,000 yen/kW (up to 50 kW), Solar car port is 1/3, Storage battery is 1/3 of price/kWh, EMS is 2/3,電/PHEV is 1/2 of power storage capacity/ 1×4 yen/kWh, charge/discharge facilities 1/2 of high-efficiency air conditioning/water heater is 1/2 of citizen. There are detailed requirements for each facility, such as FIT/FIP certification, self-consumption rate, battery safety and warranty standard, and CO2 effect with 30% or more. 4 Points of subsidy, upper limit, schedule, and application: The reception will be accepted from April 1, 2019 to December 15, 2019, 17:00, except Saturdays, Sundays and holidays. The budget is 16,904,000 yen, and it ends during the period when the budget is reached, and it is a lottery for the same day. The maximum display amount is 100 million yen by multiplying the subsidy rate of 1/3 to the solar car port "Subsidy target business cost up to 300 million yen"

Tags

ManufacturingConstructionRetailWholesaleFood serviceTourism / lodgingTransport / logisticsReal estate / leasingProfessional servicesHealthcareNursing / welfareEducationEnergy / utilityService (other)OtherEnergy saving / decarbonizationCapital investmentRegional revitalization