Nationwide

Auxiliary business of the funding support project for the bilateral credit system for the 12th year of the reiwa from the 8th year of the reiwa (JCM facility assistance business)

Agency環境省、公益財団法人地球環境センター(GEC)
Full official PDF
Max amount
¥2,000,000,000
Rate
50%
Actual spend × rate = subsidy amount (capped). Smaller spend yields just this fraction; above the cap you receive the max. Not an approval probability.
Deadline
2026-09-30 (116d)
Area
Nationwide
All 47 prefectures

Summary

This project is a subsidy program that supports projects that introduce decarbonization equipment in JCM partner countries among the Ministry of the Environment’s bilateral credit system (JCM) funding support business. As an executive organization, the ugee Center (GEC) is open to open projects starting from FY2019 to FY12. The purpose is to reduce greenhouse gas emissions, such as developing countries, by測定ing superior decarbonization technology, etc., and issue JCM credits after measuring, reporting and verification (MRV). Auxiliary target is a Japanese corporation, a representative of the international cons ium consisting of Japanese corporations and foreign corporations. Private companies, local governments, independent administrative corporations, corporate corporations, commercial facilities, etc. Representative operators are responsible for the purchase, installation, and commissioning of equipment, and are also responsible for the accounting and other administrative tasks of the subsidy business and MV of GG emissions reduction. The co-operator includes local companies, etc., and the owner and user of the facility must be a business in the international cons ium. Subsidies are expenses related to the maintenance of equipment that contributes directly to reduction of GG emissions, including energy origin CO2. In the application form, the construction fee, incidental construction fee, machine equipment fee, measurement and testing fee, equipment fee, office fee, and other expenses approved by the Center are indicated as the subject. Equipment, consumables, land acquisition costs, etc. that require removal of existing equipment, maintenance of installation equipment, emergency equipment, safety and health, and civil security are excluded. You must submit proposals, implementation plans, expenses breakdowns, PINs, MRV pledges, etc. using the electronic application system. Auxiliary rate is up to 50% depending on the results of similar technology adoption, up to

Tags

Energy / utilityManufacturingConstructionTransport / logisticsWaste / recyclingIT / softwareService (other)OtherEnergy saving / decarbonizationCapital investmentOverseas expansionRegional revitalization