About the subsidy of the 6th industrialization and local production consumption support project in Miyakojima City
Summary
1Business overview: The subsidy for the sixth industrialization and local production re支援ation project of Miyakojima City is a system that supports the introduction of processing equipment and equipment to business operators engaged in the sixth industrialization and the distribution of local production. By in。 machining equipment necessary for product development, scale expansion, and sales promotion, it is intended to lead to improvement of income of producers and related companies. The application for the 8th year of Reiwa was confirmed from April 30, 2026 to June 9, 2026. 2 Subjects: Subjects are individuals, corporations or groups applicable to all requirements. This is a person who processes市内 and fish products produced in Miyakojima City and engages in local distribution and includes new entrants. It is also necessary to complete the maintenance of processing equipment and equipment within the application year and to ensure the processing raw materials. Individuals are required to have their address in Miyakojima City and to live in the present, and the corporations or groups must have their own office in Miyakojima City. In addition, it is mandatory to pay public obligations such as city tax. 3Auxiliary Exp、s and Subsidies: Subsidies will be excluded from the consumption tax and local consumption tax for the purchase of equipment and equipment necessary for the processing of aquaculture or livestock products. The price of the equipment, equipment installation, and equipment shipping costs are the target expenses. Examples include vegetable cutting machines, electrolytic water generators, vacuum packaging machines, dryers, rapid refrigerators, freezers, etc. On the other hand, equipment and equipment that receive similar assistance from countries, prefectures or other organizations are not eligible for electricity, water construction costs, prefab installation costs, commissioning and adjustment costs, consumables costs, and other expenses. 4 Points of subsid